Christchurch Hospital

CLIENT

CPB Contractors

CONTRACT VALUE

$400 Million

SCHEDULE

2016-2019

LOCATION

Christchurch
Christchurch Hospital is the largest tertiary, teaching and research hospital in the South Island and is currently going through several upgrade transformations over the next few years. FDG was contacted at the design phase of the project to help co-ordinate the framework support of multiple services in the large plant room. Within this significant plant room, FDG supplied a solution using the highly versatile ModFrame product, which enabled all the sub-trades to support their respective services on one framing system.

FDG Products Supplied

W

ModFrame

W

Strut and Brackets

W

Structural Fasteners

W

Site Storage

Key features

W

62,000 Square Meters

W

A new emergency department and operating theatres

W

An expanded intensive care unit

W

Children’s facilities; A rooftop helipad

W

A state-of-the-art radiology department

“A great example of how trades can work together to produce a functioning, purpose-built solution allowing the building to maximize the space available and have services easily accessible to installation and ongoing maintenance.”

Get a Quote For Your Project

Latest Projects

Air New Zealand Hangar 4

Air New Zealand Hangar 4

Air New Zealand’s Hangar 4 is the world’s largest single-span timber aircraft hangar. Spanning 10,000m² at its Auckland engineering base, it’s designed for efficiency and sustainability, with a 5-6 Green Star rating, double-layer insulation, and ceiling fans for cooling. The hangar accommodates a wide-body aircraft and two narrow-body jets.

read more
Manawatū Tararua Highway

Manawatū Tararua Highway

A major slip in April 2017 left SH3 through the Manawatū Gorge impassable. Te Ahu a Turanga – Manawatū Tararua Highway is a new 11.5km route over the Ruahine Range, providing a safer, more resilient connection between Woodville and Ashhurst. The project includes six bridges, extensive earthworks, and significant environmental restoration efforts, with completion expected by mid-2025.

read more
50 Albert Street

50 Albert Street

FDG worked alongside contractors to ensure the building’s services systems were well-supported and integrated into this project’s sustainable design. The cable containment, Modframe and strut, pipe supports and seismic bracing provided by FDG were designed to meet both functional and aesthetic requirements of the project.

read more