Ara Tuhono – Puhoi to Warkworth SH1 Extension

CLIENT

NX2 Group

CONTRACT VALUE

$877.5 Million

COMPLETION

Stage 1 complete 2022

LOCATION

Wellsford SH1

As more and more people, freight and goods move around the country improved safety and connectivity has been the driving force behind the extension of State highway 1 through to Northland. FDG has the privilege of working with the NX2 Group on this project of national significance, keeping people and businesses moving and making.

With projects this big many people don’t ever get to see the detail involved and the types of product that is required. FDG provided a number of products related to the service supports and also accessories for the landscape battering. The great benefit that FDG could offer this project was – while we were local and could have stock to site within a matter of minutes, it was our National and Regional Delivery Service Promise to site that really ensured our customer’s satisfaction.

FDG has been an ongoing supplier throughout the project.

FDG Products Supplied

W

Pipe clamps

W

Threaded rod

W

Seismic anchors

W

Fasteners & Fixings

W

Strut and bracketry

W

Threaded rod for anchoring

Key features

W

Four lane dual carriageway

W

The motorway is designed to international standards and will be one of the safest roads in New Zealand when completed

W

It is estimated to carry 20,000 – 30,000 vehicles per day

W

1 Million native plants planted across the project.

W

7 long viaducts, 4 bridges

W

8 million cubic meters of earth cleared

Get a Quote For Your Project

Latest Projects

Manawatū Tararua Highway

Manawatū Tararua Highway

A major slip in April 2017 left SH3 through the Manawatū Gorge impassable. Te Ahu a Turanga – Manawatū Tararua Highway is a new 11.5km route over the Ruahine Range, providing a safer, more resilient connection between Woodville and Ashhurst. The project includes six bridges, extensive earthworks, and significant environmental restoration efforts, with completion expected by mid-2025.

read more
50 Albert Street

50 Albert Street

FDG worked alongside contractors to ensure the building’s services systems were well-supported and integrated into this project’s sustainable design. The cable containment, Modframe and strut, pipe supports and seismic bracing provided by FDG were designed to meet both functional and aesthetic requirements of the project.

read more
Lineage Cold Storage Facility – Tauriko

Lineage Cold Storage Facility – Tauriko

FDG supplied custom coloured cable containment for the Solar Panels at Lineage’s new cold-storage facility in Tauriko, New Zealand, featuring over three million cubic feet of space and more than 16,000 pallet positions, marking a significant expansion of its operations in the region.

read more